IMPORTANT POINTS WHEN TRANSPORTING

ASSEMBLY STEPS OF A MODULAR HOUSE

1.
Site Preparation

The site where the modular building will be placed needs to be prepared. This includes removing obstacles and clearing the area of vegetation.

2.
Module Transportation

The house modules are transported to the site using specialized cargo trucks. They can be lifted by a crane or unloaded using other lifting mechanisms that allow them to be placed in position.

3.
Module Assembly

After the modules are delivered, they are connected together to form a complete modular home.

4.
Connection of Utilities

After the modules are assembled, the utilities such as water supply, sewage, electricity, and heating are connected.

5.
Finishing Touches

After the utilities are connected, the final touches are done, and the modular home is ready for use.

1.
Site Preparation

The site where the modular building will be placed needs to be prepared. This includes removing obstacles and clearing the area of vegetation.

2.
Module Transportation

The house modules are transported to the site using specialized cargo trucks. They can be lifted by a crane or unloaded using other lifting mechanisms that allow them to be placed in position.

3.
Module Assembly

After the modules are delivered, they are connected together to form a complete modular home.

4.
Connection of Utilities

After the modules are assembled, the utilities such as water supply, sewage, electricity, and heating are connected.

5.
Finishing Touches

After the utilities are connected, the final touches are done, and the modular home is ready for use.

DIDN’T FIND THE ANSWER TO YOUR QUESTION?

+40765870509

uemodularhouses@gmail.com

Monday

09:00 - 17:00

Tuesday

09:00 - 17:00

Wednesday

09:00 - 17:00

Thursday

09:00 - 17:00

Friday

09:00 - 17:00

Please, send us a message to get a free, individual consultation from our manager, and get your questions answered.