DELIVERY AND INSTALLATION
DELIVERY
Delivery is not included in the cost of the house and is arranged by the customer. Upon the customer’s request, our company can provide delivery of our products using transportation companies as an additional service. In this case, the client can rely on us, and we will deliver the modular home directly to its installation site. The transportation company provides insurance for the integrity of the transported modules, which minimises risks during transportation.
The transportation of modules is accompanied by a team that handles the placement and unloading of the houses. Thanks to the use of a crane, the houses are lifted off the transport vehicle and installed at the destination with great precision.
The assembly of a modular house typically takes only 1-2 days, depending on the size and complexity of the project. The client has the option to assemble the house themselves or request our company to handle the on-site assembly. Our installation team ensures high quality and precision in their work to provide you with comfort and enjoyment in your new home. All delivery and installation terms are individually negotiated and documented in the contract.
IMPORTANT POINTS WHEN TRANSPORTING
- The presence of a good and smooth road
- Access road of at least 4 m.
- There should be no low branches and wires along the route of travel at a height of 4.5 m.
- Turns must be smooth for an 11 m machine to turn.
BASIC REQUIREMENTS FOR THE FOUNDATION
MODULAR BUILDING INSTALLATION
Reliability and stability: The foundation must ensure the stability of the modular house throughout its operating period.
Conformity with soil conditions: The foundation must be calculated taking into account the characteristics of the soil at the construction site.
Waterproofing: The foundation must be able to prevent moisture from penetrating from the soil into the house.
Suitability for quick installation: Modular house foundation should be designed for quick and efficient installation.
ASSEMBLY STEPS OF A MODULAR HOUSE
Site Preparation
The site where the modular building will be placed needs to be prepared. This includes removing obstacles and clearing the area of vegetation.
Module Transportation
The house modules are transported to the site using specialized cargo trucks. They can be lifted by a crane or unloaded using other lifting mechanisms that allow them to be placed in position.
Module Assembly
After the modules are delivered, they are connected together to form a complete modular home.
Connection of Utilities
After the modules are assembled, the utilities such as water supply, sewage, electricity, and heating are connected.
Finishing Touches
After the utilities are connected, the final touches are done, and the modular home is ready for use.
Site Preparation
The site where the modular building will be placed needs to be prepared. This includes removing obstacles and clearing the area of vegetation.
Module Transportation
The house modules are transported to the site using specialized cargo trucks. They can be lifted by a crane or unloaded using other lifting mechanisms that allow them to be placed in position.
Module Assembly
After the modules are delivered, they are connected together to form a complete modular home.
Connection of Utilities
After the modules are assembled, the utilities such as water supply, sewage, electricity, and heating are connected.
Finishing Touches
After the utilities are connected, the final touches are done, and the modular home is ready for use.
DIDN’T FIND THE ANSWER TO YOUR QUESTION?
+40765870509
uemodularhouses@gmail.com
Monday
09:00 - 17:00
Tuesday
09:00 - 17:00
Wednesday
09:00 - 17:00
Thursday
09:00 - 17:00
Friday
09:00 - 17:00
Please, send us a message to get a free, individual consultation from our manager, and get your questions answered.